Bastion Concrete Industries LimitedRC 9689301

German Precision. Nigerian Foundations.

Bastion Concrete Industries is building an automated precast concrete plant in Lagos. Every block and paver will come off a MASA production line from Germany, cured and tested to the same specification, batch after batch.

Plan drawing of a 6-inch hollow blockPlan view, 450 millimetres long by 150 millimetres wide, with two rectangular cavities. Height 225 millimetres.4501506-inch hollow block, planHeight 225 mmUnits mmBastion Concrete Ind.Not to scale
Production line
MASA L 9.1, Germany
Rated capacity
11.75m units a year
Site
5 hectares, Lekki-Epe
First production
Targeted Q1 2028

Rated capacity on two shifts. Status: in development.

Products

The product range.

Full strength and dimensional data will be published from plant test results at commissioning.

See product drawings and uses

6-inch hollow block

450 × 150 × 225 mm

Internal walls and framed-building infill. The plant’s lead product, designed to NIS 87.

9-inch hollow block

450 × 225 × 225 mm

External, load-bearing and fence walls. Designed to NIS 87.

60 mm interlocking paver

60 mm thick

Driveways, walkways, estates and car parks. Designed to NIS 450.

80 mm heavy-duty paver

80 mm thick

Roads, industrial yards and loading areas. Designed to NIS 450.

Kerb stone

Standard road profiles

Road edges, medians and drainage channels. Designed to NIS 450.

Technology

German-built, Lagos-made.

See the production process

Most blocks in Lagos are made by hand or on small machines, and their strength varies from one batch to the next. An automated line removes that variation.

MASA GmbH, Germany

The production line is supplied by MASA, a German maker of automated concrete block and paver plants.

Automated consistency

Machine batching, vibration and curing give every unit the same density and strength.

Export credit backed

The equipment contract is structured with German export-credit cover, the standard route for long-life industrial plant.

Plant and pipeline

The Lekki-Epe plant.

See the plant milestones

The plant site is on the Lekki-Epe corridor, where Lagos is growing fastest, between the city and the Lekki Free Zone and deep-sea port.

Site
Idera Industrial Scheme, Lekki-Epe corridor, Lagos
Coordinates
6°29′24.71″N 3°50′01.31″E
Site area
5 hectares
Production line
MASA L 9.1 automated line
Rated capacity
11.75 million units a year on two shifts
First production
Targeted Q1 2028
Financing structure
Development-bank senior debt, German export-credit cover on the equipment, promoter and co-investor equity

Status: in development. Plant equipment, site and financing structure selected. Construction follows financial close.

Building on the Lekki-Epe corridor?

Developers, contractors and distributors can register interest in offtake ahead of commissioning.

Or write to [email protected]